Set in form of a corona
2002 + Mock-ups + Completed
Location Budapest. Chain bridge
Info
In 2002, one of the main attractions of the traditional August 20 fireworks was a steel structure that, shaped after the crown of Hungary’s St. Stephen and placed in the middle of the Chain Bridge, was used to house and launch various pyrotechnics. Erected in three days and taken down in one day – all without restricting traffic on the highly protected landmark bridge –, the steel structure was my own design, in collaboration with structural engineer András Markovits.